GRB piping work in Majnoon oil field
Client: CPP-SHELL
SOW: prefabrication, and installation of 2”-32’’ GRB 20000 inch pipes for treatment station
Duration: 5 months
Project status: Completed
The idea of establishing the QA Qimat AL-Iqtidar engineering for contracts came as a stepping-stone in the progress of the country and one of the models of construction, giving and success at the local level and global.