Horizontal boring crossing pipe
Horizontal drilling 28 diameter five
point from DGS6 –DGS 8 at length 258
mt. by boring machines in western
Qurna 2 under supervision CPP
11/2017 - 03/2018
The idea of establishing the QA Qimat AL-Iqtidar engineering for contracts came as a stepping-stone in the progress of the country and one of the models of construction, giving and success at the local level and global.